Planning Enterprise
The SODOO Planning module is an advanced planning tool for optimising team resources and work shifts. With visual Gantt charts, shift management and workload analysis…
Overview
The SODOO Planning module is an advanced planning tool for optimising team resources and work shifts. Maximise resource use with visual Gantt charts, shift management and workload analysis.
Resource Management
Manage and assign employees, equipment and other resources centrally.
Shift Planning
Build work schedules easily with flexible shift templates.
Gantt View
Plan tasks and resources visually on a timeline.
Workload Balancing
Prevent overload and distribute resources evenly.
The Planning module works integrated with the Project, Helpdesk and Field Service modules. You can plan all your resources from one place.
Resource Management
Planning resources represent all assets that can be assigned: employees, equipment, vehicles or meeting rooms.
Ahmet Yılmaz
Software Developer • IT TeamElif Kaya
Project Manager • PMOMehmet Demir
Graphic Designer • CreativeResource Types
| Resource Type | Description | Example |
|---|---|---|
| Employee | Human resources, staff who can be assigned tasks | Developer, Designer, Technician |
| Equipment | Machines and tools | CNC Machine, Forklift, 3D Printer |
| Space | Physical spaces | Meeting Room, Conference Hall |
| Vehicle | Vehicles and logistics resources | Service Vehicle, Courier Motorbike |
Shift Planning
Create flexible shift templates for your employees and manage weekly schedules easily. Distribute morning, afternoon and night shifts evenly.
Shift Templates
| Template | Working Hours | Break | Total |
|---|---|---|---|
| Morning | 08:00 - 16:00 | 12:00 - 13:00 (1 hour) | 7 hours net |
| Afternoon | 14:00 - 22:00 | 18:00 - 18:30 (30 min) | 7.5 hours net |
| Night | 22:00 - 06:00 | 02:00 - 02:30 (30 min) | 7.5 hours net |
Shift templates are synchronised with the working calendar in the HR module. Days off and public holidays are taken into account automatically.
Gantt View
The Gantt chart lets you plan tasks and resources visually on a timeline. You can edit quickly by drag and drop.
Gantt Features
Drag and Drop
Change a task's date and duration by dragging it.
Dependencies
Show dependencies between tasks with arrows.
Filtering
Filter by resource, project or date.
Zoom
Switch between day, week or month views.
Workload Analysis
See each resource's current workload and distribute tasks evenly to prevent overload.
Capacity Planning
| Source | Weekly Capacity | Assigned Hours | Utilisation Rate | State |
|---|---|---|---|---|
| Ahmet Yılmaz | 40 hours | 30 hours | %75 | ● Medium |
| Elif Kaya | 40 hours | 38 hours | %95 | ● High |
| Mehmet Demir | 40 hours | 16 hours | %40 | ● Low |
A load above 90% shows that the resource is overloaded. This can lead to delays and quality problems. Redistribute the tasks.
Conflict Management
The system warns automatically when a resource is assigned at clashing times. You can resolve conflicts with one click.
- Ahmet Yılmaz - 2 tasks clash on 15 January between 14:00 and 16:00
- Meeting Room A - 2 bookings on 16 January at 10:00
- Service Vehicle 1 - a task clashes with maintenance on 17 January
Conflict Resolution Methods
Shift the Time
Change the time of one of the clashing tasks.
Change the Resource
Assign the task to another available resource.
Split
Split the task into parts and spread them over different times.
Cancel
Cancel or postpone the lower-priority task.
Recurring Tasks
Define regularly occurring tasks as recurring. The system creates the task automatically at the set interval.
Recurrence Intervals
| Period | Description | Example Use |
|---|---|---|
| Daily | At the same time every day | Daily stand-up meeting |
| Weekly | On selected days | Monday sprint planning |
| Every Two Weeks | Every 14 days | Sprint retrospective |
| Monthly | On a set day of the month | Monthly maintenance check |
| Dedicated | A defined RRULE | The first Monday of every quarter |
Create a template for recurring tasks. Then the task description, checklist and assigned resources are filled in automatically on every occurrence.
Integrations
The Planning module works fully integrated with SODOO's other modules.
Project
Project tasks are reflected in planning automatically. Filtering by project in the Gantt.
Helpdesk
Assign and plan support tickets for technicians.
Field Service
Plan field tasks with route and time optimisation.
Human Resources
Employee leave and holidays are included in planning automatically.
Calendar
Planned tasks are also shown in the calendar view.
Manufacturing
Machine and operator planning for work orders.
Reports
Analyse resource use, efficiency and planning accuracy.
Available Reports
| Report | Description | Used For |
|---|---|---|
| Resource Utilisation Rate | How much of each resource's capacity is used | Capacity planning, hiring decisions |
| Planned vs Actual | Comparison of the estimated and the actual time | Improving estimate accuracy |
| Efficiency Trend | Change in productivity over time | Performance tracking, areas for improvement |
| Conflict History | Conflicts that occurred and their resolution times | Improving the planning process |
| Overtime Analysis | Overtime and under-time | Work-life balance, cost control |
All reports can be exported in Excel, PDF and CSV formats. You can also do custom analyses with pivot tables.